A sales order's quoted costing can now become a Production Costing that is checked against the order BOM and routing before the order's budget is released.
New costing versions keep all cost rows
Creating a new version of a garment costing used to drop the fabric, trims, labels, making and value-addition rows. They are now carried over. Versions created before this fix remain incomplete.
Production costing for sales orders
Once a sales order exists, the costing it was priced from can be turned into a Production Costing for that order. The quoted costing is left unchanged. Order lines priced from the same costing (the colour and size variants) are validated and released together.
Production validation report
A new report compares the costed quantity, rate and value with the order BOM and routing, with detail for each variant. It highlights materials that were never costed, over-consumption, higher rates, and variants with nothing costed. Rows can be mapped to BOM items. Each blocking deviation must be corrected or accepted with a reason. An acceptance lapses if the excess grows. The report can be printed or exported to PDF.
Release validated costing to the Sales Order Budget
A validated order style can be released to the Sales Order Budget. BOM quantities are budgeted at the costed rate, operations as routed, and expenses as costed. The report is then frozen and the costing is locked. To change a released costing, use Revise.
Approval for releases above quoted cost
A release that is above the quoted cost, or that has accepted deviations, goes for approval to the new Production Costing Approver role. The requester cannot approve their own release.
Tolerances and optional validation settings
Costing settings now let you set quantity and rate tolerances for each section. Two optional switches are off by default: create the production costing automatically when an order is created, and allow budgeting only after validation. Companies that don't turn them on see no change.